The Project is a four story 192 bed long term care home comprising approximately 152,419 square feet with six resident home areas.  
Project to commenced late summer/ early fall 2023 and to achieve Substantial Performance of the Work by no later than late summer/ early fall, 2025, subject to any agreed upon changes to the Project Schedule.
LAURIN invites trade contractors to submit Stipulated Price Quotations (the Quotation) to perform the following Work:
 -            Building excavation/backfilling and site preparation
-             Site services
-             Landscaping
-             Asphalt paving
-             Fencing
-             Formwork
-             Insulated concrete forms
-             Reinforcing steel
-             Concrete supply
-             Concrete finishing
-             Precast concrete hollow core slabs
-             Architectural precast concrete
-             Self-levelling topping for precast concrete floor slabs
-             Masonry
-             Structural steel
-             Miscellaneous Metal fabrications, steel stairs and ladders
-             Roof-mounted duct cross-over
-             Rough carpentry
-             Millwork, finish carpentry
-             Waterproofing
-             Foamed-in-place insulation
-             EIFS
-             EPDM roofing
-             Fire stopping
-             Joint sealants
-             Doors and frames, finish hardware
-             Aluminum doors and frames, glazed curtain wall
-             Coiling vertical lift doors
-             Automatic swinging door entrance operators
-             Vinyl windows
-             Drywall
-             Flooring
-             Painting
-             Toilet compartments, washroom accessories
-             Wall protection, corner guards and hygienic wall covering
-             Metal lockers
-             Gearless traction passenger elevator
-             Refuse and linen chutes
-             Fire suppression system
-             Plumbing
-             HVAC
-             Electrical and fire alarm system.