Carleton University is made up of 45 buildings with 374,000 square meters of built space on 62 hectares of land. Carleton University supports a community of 29,000 students, staff and faculty of which almost 3,000 live on campus eight months of the year.
 
Carleton University conducts a regular master planning process which engages the community to develop a long term development plan for the university facilities. The latest five-year Master Plan was adopted in 2016.   For more general information about the institution, please visit the institution’s home page at www.carleton.ca
 
CU_FMP manages approximately CAD$50 million in construction-related contracts annually.  These contracts range from a few thousand to multi-million dollars depending upon the size of the construction project.  Each project is created either thru internal programming (i.e.: building renewal and capital plan) or generated as a request by a member of the university (I.e.; lab fit-up, etc.).   The total number of projects completed each year is around 200 with 50-75 active (in construction) projects at any given time   For more information about the Facilities Management and Planning, please visit our home page at www.carleton.ca/fmp
 
Project Description
 
Intersection improvements at Campus Avenue and University Drive
	- Road widening
 
	- New concrete/asphalt walkways
 
	- Landscaping (new trees, relocated trees, shrubs, sod)
 
	- Cut back existing landscape retaining wall
 
	- Relocate existing site features (signs, bollards, lights, emergency communication pole)
 
	- Line painting
 
	- Provide traffic control during construction
 
 
Grind and pave asphalt on Campus Avenue 
	- From University Drive to Residence Commons
 
	- Match current elevations
 
	- Existing catchbasins/manholes, raised concrete cross-walks, sidewalks, curbs, and sewers to remain (unless otherwise indicated)
 
	- Line painting
 
	- Provide traffic control during construction
 
 
A Pre-Bid visit will be held on Tuesday April 17, 2018 @ 10:00AM (EST). Attendees will
meet at Statue in Front of Richcraft Building at Carleton University.
 
Please visit the following FTP site for Specifications and Drawings:
http://www.mediafire.com/folder/y1n9k2mhjdg4a/2018-04-05_IFT